Friday, November 24, 2006



Pouring Tuttle's foundation walls last week.



Another wicked sunset on Nov 22, from my house.

Sunday, November 19, 2006




Friday's (Nov 17th) sunset


The front of the house with trim up. The pieces that are vertical are one piece.

Thursday, November 16, 2006



A foggy start to the morning.
The finished upper deck.



A look from below.
A close up of the custom hanger made for the joist.




Mr. Smith cutting all the joists to length.

Wednesday, November 15, 2006



The footings are poured.

Tuesday, November 14, 2006

This morning it is just starting to snow hard. They are saying anywheres from 10-20 inches (25.4 cm - 50.8 cm for those of you using metric) we will see though.

Thursday, November 09, 2006

Prep is done, starting to lay out the footings. We will be getting our inspection on Monday.


More Smallen siding



Inside corner detail


Finished trim around the windows



A whole side done except the soffits and facia


Into the Master Suite

Tuesday, November 07, 2006

Trim detail for the Smallen Job


The finished trim and siding look

Sunset from Jan Tuttle's Lot Tonight.



Prepping the house site for footings.


More Prepping

Start of the new job for Jan Tuttle a while in the making.

Start the foundation dig.


The driveway cut.


One more shot of the foundation dig.

Saturday, November 04, 2006


Tonight's full moon


Tonight's Sunset

Scott cutting out the siding for underneath a window.


Here I am installing more pieces.


Keya observing our progress.

Thursday, November 02, 2006

One more Ice Crystal picture.

Construction Communication




The Siding going up.



Morning Ice Cryatals on Windows.